Not logged in | Log in | Sign Up
Some renovation work of the tracks??
Koskela depot was under construction work last winter/spring. The main building was enlarged to cover all the switches on railyard.
There are still some rails and switches on the yard wich are not covered and most of rail is so called surface rails (so the profile of rail is normal)